Contracts' Procedural Rules
Back to Constitution Contents webpage
1.0 Contract Procedure Rules
1.1 Introduction
These Procedure Rules, which are required by Section 135 of the
Local Government Act 1972, apply to all contracts that the Council
enters into after the 1st April 2006. Any Tender already in
place for works, materials or services will be governed by the
Procedure Rules in force at the time the Tender was issued.
1.2 Value for Money
In some parts of these Procedure Rules, Officers are given
discretion in what they do, or are able to issue instructions based
on that discretion. If this is the case, then they are only able to
exercise that discretion or issue such an instruction if they can
show that it allows the Council to achieve value for money and the
efficient provision of services by or to the Council in all the
circumstances.
1.3 Best Value
When preparing Contracts, Officers must be guided by the
requirements of Best Value and must follow all guidelines issued by
the Head of Corporate Governance in consultation with the Head of
Legal and Democratic Services
1.4 Interpretation and Definitions
1.4.1 These Procedure Rules are to be read in the context of
legislation and relevant European Community Rules dealing with
publicity, the compilation of Select Lists, issuing invitations to
tender and anything else which relates to the letting of Contracts
by the Council. These Contract Procedure Rules shall always be
considered in the light of any procurement strategy, Government
legislation and EC Rules. Regard must also to be had to the
Council’s Procurement Code of Practice.
1.4.2 The Head of Legal and Democratic Services is responsible
for the interpretation of these Contract Procedure Rules. The Head
of Legal and Democratic Services is also responsible for the
preparation and guidance on particular aspects of Procedure Rules,
including European Public Procurement.
1.4.3 The singular shall include the plural and the masculine
gender shall include the feminine gender and vice versa.
1.4.4 In these Contract Procedure Rules, the following
expressions have the following meanings:-
| Executive |
Includes any Committee or Sub-Committee of the Executive
Contract Includes any Official Order issued by a Head of Service or
other authorised Officer
|
| Contractor |
The legal personality with which the Council contracts |
|
Financial Procedure Rules
|
The Financial Procedure Rules of the Council |
| Goods and Services |
As defined in the European Procurement Directives |
|
Audit Partnership Manager
|
The appointed Officer or any Officer authorised by him |
| Official Order |
An Official Order issued in accordance with Financial
Regulations
|
| Quotation |
The written statement of the market price of specified
goods, services or work |
| Select List |
The Council’s Select List of Contractors |
| Head of Service |
The appointed Head of Service, Chief Executive, Deputy Chief
Executive, Director or any person authorised by either of them
|
| Tender |
A formal written offer made in competition to supply specified
goods or services or carry out specified work at a stated cost or
rate
|
| Work or Works |
As defined in the European Procurement Directives |
1.4.5 Subject to 1.5 below these Contract Procedure Rules apply
to all Contracts between the Borough Council and any Contractor
(including consultants) whether or not the Contract involves the
Council paying or receiving money or any other consideration.
1.5 Exceptions to Procedure Rules
These Contract Procedure Rules shall apply to all Contracts
except:-
(a) if the Council or the Executive decides
otherwise and gives its reasons in the Minutes.
(b) in the case of an emergency or other
special circumstance identified by the appropriate Head of Service.
If this happens, the Head of Service must either submit a report to
the next available meeting of the Executive explaining why he
considered it was an emergency or special circumstance or,
alternatively, include a report in the Information Digest. The
report must identify the particular Procedure Rule(s) which have
not be followed and the reasons.
(c) Contracts of employment entered into by
the Personnel and Development Manager in relation to directly
employed staff. Where Consultants or other individuals (including
temporary staff) are appointed to carry out specific services,
Contract Procedure Rules do apply.
(d) when dealing with the acquisition or
disposal of interests in or rights over land.
1.6 Amendment and Review
1.6.1 These Contract Procedure Rules may only be amended by
submitting a report to the Executive which will make
recommendations to the Full Council.
1.6.2 The Head of Financial Services must, in consultation with
the Head of Legal and Democratic Services, review the financial
limits in these Contract Procedure Rules at least every five years
and report any recommendations to the Executive which will make
recommendations to the Full Council.
2.0 Certificate Under Local Authorities (Contracts) Regulations
1997
2.1 The Local Government (Contracts) Act 1997 and
regulations made thereunder provide for a local authority to
certify that it has the powers to enter into a
contract.
2.1 If any Officer is asked to issue a Certificate under the
Local Authorities (Contracts) Regulations 1997, he must immediately
report the situation to the Head of Legal and Democratic
Services.
2.2 Any Certificate under the Local Authorities (Contracts)
Regulations 1997 shall only be issued if the Council agrees with
the proposal following a joint report to the Executive by the Audit
Partnership Manager, the Head of Legal and Democratic Services and
the Chief Executive. The form of any such Certificate must be
approved by the Council’s Monitoring Officer and signed by the
Council’s statutory Chief Finance Officer.
2.3 The Executive will make a recommendation to the Full
Council.
3.0 Annual Contracts / Aggregation
3.1 A Head of Service should think about tendering for an annual
(or “call off”) Contract if he is likely to need a number of
similar requirements during a financial year but cannot
realistically estimate the amount of work or cost involved. In such
cases, orders may be issued as required on the basis of previously
tendered rates or prices.
3.2 Officers must not break down what would normally have been a
single Contract into smaller lots in order to avoid the provisions
of these Contract Procedure Rules or appropriate EC Directives.
4.0 Market Testing / Indicative Bids
If an Officer wants to find out about the market price of an
item or service (either for Best Value benchmarking or for some
other reason) then he must make it clear in the invitation that he
is not planning to choose a service provider but is simply finding
out whether or not the Council will ask for Tenders at a later
date.
5.0 Contracts Excluded From Competition
Tenders or Quotations must be sought for all Contracts except
where:-
(a) the Head of Service is satisfied that
goods or materials are only available from one manufacturer or that
the services can only be supplied by one Contractor.
(b) the identity of the person supplying a
professional service is particularly important. The Head of Service
is responsible for this decision and must document the reasons for
such decision.
(c) the work is of a specialist nature and
the skill of the particular Contractor is particularly important.
The Head of Service is responsible for this decision and must
document the reasons for such decision.
(d) parts are being bought for existing
machinery or plant.
(e) goods or materials are bought through a
consortium of which the Council is a Member.
(f) the Contract is a continuation of an
existing Contract - but note: This exception only applies if
the new Contract is negotiated with the Contractor on the basis of
rates and prices which were originally agreed (in the existing
Contract) through the normal tendering process. This exception can
only be used to allow any one Contract to be extended once except
in the case of Housing Revenue Account Programme of Works contracts
where the following will apply:
(i) any proposed extension being agreed with
the Head of Legal and Democratic Services
(ii) any contract or extension shall not
exceed four years in duration
(iii) the original tender documentation
having indicated the possibility of any potential extension
(iv) the Head of Housing being satisfied
that following a review of the contractors previous performance
that it is proper for an extension to be granted.
(g) equipment needs to be maintained by the
manufacturer of that equipment and only the manufacturer can
provide the maintenance.
(h) where equipment is supplied under terms
which require maintenance be undertaken by a specified
provider.
In the event of doubt as to whether any exception can be used,
the Head of Service should seek the advice of either the Audit
Partnership Manager or the Head of Legal and Democratic
Services.
These exceptions are conditional on any statutory or European
constraints
6.0 Contracts Which Must Be Made Under Competition
6.1 Estimate of Contract Cost
Prior to issue of Tender documentation, the Head of Service must
estimate what he thinks the proposed Contract will cost and keep a
record of his estimate and how he made the calculation.
6.2 Public Advertisement
Whilst this standing order gives financial limits regard
must always be had to the EU requirements in respect of low value
advertising
6.2.1 A public advertisement must (unless otherwise agreed by
the Head of Legal and Democratic Services) be placed:-
(a) whenever the estimated cost or income
exceeds £150,000 (Goods and Services) or £250,000 (Works) except in
the case of Housing Revenue Account Programme of Works where this
shall only apply to the first phase of any contract subject to full
financial vetting being carried out when any (individual) extension
exceeds £250,000 in value.
(b) if a Head of Service thinks it is in the
Council’s interest.
(c) if required under EC Rules or Government
legislation.
6.2.2 Prior to placing an advertisement the Head of Service must
document his selection criteria which will be used for selecting
those to be invited to tender. A written record must be kept
identifying the reasons why anyone who has responded to the
advertisement has not been selected for tendering purposes.
6.2.3 The procedure for public advertisement (except where 6.2.4
applies) is as follows:-
(a) an advertisement needs to be placed in
at least one local newspaper, if appropriate, and in one or more
newspapers or journals which are likely to be read by potential
suppliers. The advertisement needs to explain what the Contract is
for and give potential Contractors at least 10 clear working days
to express an interest.
(b) when the closing date is reached, Tender
documents must be sent to those potential suppliers who meet the
right technical standards and – for Contracts costing more than
£150,000 (Goods and Services) or £250,000 (Works) – who have been
financially vetted. The number of people invited to tender is down
to the Head of Service, who needs to ensure that he invites enough
people to achieve value for money but wherever possible shall not
be less than four.
6.2.4 If EC Rules or legislation apply, then those Rules or
legislation must govern the way in which the advertisement is
placed. All EC advertisements must be placed by the Head of Legal
and Democratic Services through the Office for Official
Publications of the European Communities. The EC advertisement must
be despatched before any national advertisement appears.
6.2.5 Except where the Select List procedures apply, any
proposed tender with a value in excess of £50,000 should be
advertised using the Council’s web site and allowing prospective
tenderers at least ten clear working days to express an
interest.
6.3 Contracts For The Supply Of Goods Or
Services
6.3.1 Estimated Value to exceed £150,000
(a) There must be a public and Council
website advertisement (unless the requirement for public
advertisement has been waived- Contract Procedure Rule 6.2).
(b) The Head of Service must prior to
selecting any prospective tenderers have a clearly written
selection criteria.
(c) Any Contractor invited to tender must be
have been vetted for technical competence.
(d) Prior to the award of a contract the
successful Tenderer must have been vetted for financial
stability.
(e) When inviting Tenders, the Head of
Service must at the same time inform the Audit Partnership Manager
and the Customer Contact Centre. They must also specify the
proposed arrangements for the opening of Tenders received.
6.3.2 Estimated Value at between £50,000 and £150,000
(a) Except where the Select List procedures
apply the proposed procurement shall be advertised on the Council’s
web site giving potential suppliers at least ten clear working days
to express an interest.
(b) The Head of Service is responsible for
identifying prospective suppliers. If possible, four suppliers who
have been vetted for technical competence should be invited to
tender. The Head of Service must keep a written record of his
selection criteria.
(c) When inviting Tenders, the Head of
Service must at the same time inform the Audit Partnership Manager
and the Customer Contact Centre. They must also specify the
proposed arrangements for the opening of Tenders received.
(d) The Head of Service can accept the
lowest tender as long as it is for less than £150,000 unless it is
the only tender when the agreement of the Head of Financial
Services must be first obtained.
6.3.3 Estimated Value up to £50,000
(a) The Head of Service needs to be
satisfied, as far as possible, that anyone invited to quote for the
work is technically competent. A quotation is required, although
the number of quotations invited is a matter for the Head of
Service.
(b) Heads of Service should ask for
quotations to be returned in a plain sealed envelope labelled
“Quotation”, followed by the subject to which it relates. The
envelope must be addressed to the Head of Service.
(c) The Head of Service can accept the
lowest quotation as long as it is for less than £50,000 unless it
is the only quotation when the agreement of the Head of Financial
Services must be first obtained
6.4 Contracts For The Execution Of Work
6.4.1 Estimated Value to exceed £250,000
(a) There must be a public and Council
website advertisement (unless the requirement has been waived-
Contract Procedure Rule 6.2).
(b) The Head of Service must prior to
selecting any prospective tenders have a clearly written selection
criteria.
(c) Any Contractor invited to tender must be
vetted for technical competence and financial suitability.
(d) A Surety Bond or guarantee from a parent
company is required unless the Head of Service determines
otherwise. If a Surety Bond is required for any contract, then the
tender documentation needs to ask all Tenderers to price for the
Bond as a separate item
(e) When inviting Tenders, Heads of Service
must at the same time inform the Customer Contact Centre giving
brief details of the contract and specifying the proposed
arrangements for opening of Tenders received.
6.4.2 Estimated Value between £150,000 and £250,000
(a) Except where the Select List procedures
apply the proposed procurement must be advertised on the Council’s
web site giving potential contractors at least ten working days to
express an interest.
(b) The Head of Service must prior to
selecting any prospective Tenderers have a clearly written
selection criteria
(c) The Head of Service is responsible for
identifying prospective Tenderers. If possible, four Contractors
who have been vetted for technical competence should be invited to
tender.
(d) A Surety Bond is not required unless the
Head of Service wants one. If a Surety Bond is required for any
Contract, then the documentation must ask all Tenderers to price
for the Bond as a separate item.
(e) When inviting Tenders, the Head of
Service must at the same time inform the Audit Partnership Manager
and the Customer Contact Centre giving brief details of the
contract and specifying the proposed arrangements for the opening
of Tenders received.
6.4.3 Contracts estimated to be between £50,000 and £150,000
(a) If there is a Select List of potential
Contractors for the type of work to be carried out, it must be used
(subject to personal limit being not less than the estimated
contract value when seeking Tenders) except where a public
advertisement is used under Contract Procedure Rule 6.2.
(b) Tenders shall be invited from at least
three Contractors on the appropriate category of the Select
List.
(c) Where the category of work is not
included in the Select List, the Head of Service is responsible for
identifying prospective Tenderers. An advertisement must be placed
on the Council’s website. At least three Contractors who have been
vetted for technical competence should be invited to tender.
(d) When inviting Tenders, the Head of
Service must at the same time inform the Audit Partnership Manager
and the Customer Contact Centre giving brief details of the
contract and specifying the proposed arrangements for the opening
of Tenders received.
(e) A Surety Bond is not required unless the
Head of Service wants one. If a Surety Bond is required for any
Contract, then the documentation must ask all Tenderers to price
for the Bond as a separate item.
6.4.4 Contracts for less than £50,000 in total value
(a) The Head of Service needs to be
satisfied, as far as possible, that anyone invited to quote for the
work is technically competent and in a position to fulfil the
contract.
(b) Quotations shall be invited from at
least two Contractors.
(c) The Head of Service should ask for
quotations to be returned in a plain sealed envelope labelled
“Quotation”, followed by the subject to which it relates. The
envelope must be addressed to the Head of Service.
(d) The Head of Service can accept the
lowest quotation as long as it is for less than £50,000 unless it
is the only quotation when the agreement of the Head of Financial
Services must first be obtained.
7.0 Tender Return
7.1 Unless use is being made of electronic tendering, the tender
documentation must make it clear that tenders are to be returned in
plain sealed envelopes or packages which clearly state “Tender”
followed by the subject involved and which bear no mark or
identification of the sender. The envelope or package must be
addressed to the Customer Contact Centre
7.2 The procedure to be adopted in respect of electronic
tendering shall be in accord with a protocol prepared by the Head
of ICT and Customer Services in consultation with the Corporate
Governance Manager and the Head of Legal and Democratic
Services.
8.0 Surety Bonds And Parent Company Guarantees
8.1 Where a Surety Bond is required, it has to be:-
(a) in a form to be determined by the Head
of Legal and Democratic Services.
(b) valued at 10% of the Contract Sum unless
otherwise agreed with the Head of Financial Services.
(c) with a financial institution approved by
the Head of Financial Services.
8.2 The Head of Service can obtain a parent company guarantee
instead of a Bond, in which case, it must be in a form which is
acceptable to the Head of Legal and Democratic Services.
9.0 Tendering And Quotation Procedures
9.1 Fixed Budget Tenders
9.1.1 Where a project has a fixed level of funding and it is not
practical to specify in detail the extent of the work, supply or
service required, Tenderers should be given the budget figure and
asked to specify what they would provide for the money.
9.1.2 The Tender documentation needs to set out how the Tender
will be evaluated.
9.1.3 The Head of Service is responsible for making sure his
selection process is clear and “transparent” and should keep a full
written record of his evaluation process.
9.2 Receipt, Looking after and Opening of Tenders
(non-electronic)
9.2.1 Except where Contract Procedure Rule 9.3 applies, no
Tender can be considered unless it is received in a plain sealed
envelope or package bearing the word "Tender" followed by the
subject to which it relates. Tenders must be securely looked after
by the Customer Contact Centre until they are passed to the Head of
Service at the time when they are due to be opened.
9.2.2 All Tenders shall be opened at the same time, if possible
on the day that the Tenders close. If the estimated cost is
£250,000 or less, they may be opened by the Head of Service in the
presence of another Officer.
9.2.3 When the estimated cost exceeds £250,000 Tenders must be
opened in the presence of the Head of Service, the Audit
Partnership Manager and a Member of the Council. The Customer
Contact Centre must not release the Tender envelopes until these
people are available.
9.2.4 When opening Tenders, Heads of Service must make sure that
a Tender Return Sheet is completed. Each Tender sum must be
recorded on this Sheet, which must be signed by all those present
at the opening and passed to the Head of Financial Services with a
copy to the Audit Partnership Manager.
9.2.5 The Head of Service is responsible for keeping the Tender
documentation safe during the evaluation process, after which the
successful Tender forms part of the contract. The second most
acceptable Tender should be kept by the Head of Service for a
minimum of three months.
9.2.6 Up until a formal contract has been agreed with the
successful Tenderer, all sums involved should be treated as
confidential. They must only be disclosed to Officers or Members
who need to know in connection with their duties or to comply with
these Contract Procedure Rules.
9.2.7 In the case of contracts with a value in excess of the EC
threshold, the outcome of the tendering exercise must be formally
notified to unsuccessful Tenderers at least 15 calendar days prior
to the successful Tenderer contracting with the Council. The
successful Tenderer must be informed of the notification sent to
the unsuccessful Tenderers advising that the Council may:-
(a) until the contract has been signed
either abandon the procurement or cancel the award procedure
without the Tenderers being entitled to claim any compensation
(b) suspend signing the contract for
additional examination, if justified by requests or comments made
by unsuccessful Tenderers during the fifteen day period or by any
other relevant information received during that period
9.3 Marked Tenders
If the Tender envelope or package reveals the identity of the
Tenderer:-
(a) the Tender must be opened in accordance
with Contract Procedure Rule 9.2.
(b) if the Head of Service wants to accept
the Tender, he can only do so if the Head of Legal and Democratic
Services agrees.
9.4 Late Tenders
If a Tender envelope or package is received after the time and
date for the return of tenders then it shall not be considered.
9.5 Tender Negotiation
9.5.1 This will only be permitted where:-
(a) the Tender has been invited under the
European Community negotiated or competitive dialogue procedure and
notice has been given by the Head of Legal and Democratic Services
in the Supplement to the Official Journal of the European
Communities.
OR
(b) the Tender figure is below the
appropriate European Community threshold and the Head of Legal and
Democratic Services has agreed to the use of a negotiated
procedure.
OR
(c) the aim is to negotiate the continuation
of an existing Contract in accordance with the provision of
Contract Procedure Rule 5(f).
9.5.2 Where a negotiated procedure is used:-
(a) there must be a clear and rigorous
method of evaluating Tenders that takes account of price, quality,
innovation and improvement.
(b) all prospective Tenderers must be told
in advance how the evaluation will be carried out.
(c) at least two Officers must carry out the
evaluation and agree on the results.
9.5.3 Where Post-Tender negotiations take place:-
(a) they must always be carried out by more
than one Officer from the Council.
(b) clear delegation limits must have been
given to the negotiators.
(c) an accurate written record must be made
promptly following all formal and informal meetings.
(d) the results of negotiations must be
fully documented.
9.6 Custody and Opening of Quotations
9.6.1 Quotation envelopes shall be kept in a secure place by the
Head of Service until it is time for them to be opened.
9.6.2 All quotations shall be opened at the same time, if
possible, on the day that quotations close.
9.7 Tender/Quotation in Excess of Estimate
9.7.1 Subject to 9.7.1(a), 9.7.1(b) and 9.7.2, if the most
acceptable Tender or Quotation exceeds the budget estimate, it can
only be accepted if it is approved by the Executive and only then
if it is within the budget head threshold. If it exceeds that
amount the Executive must make a recommendation to the Full
Council.
(a) If the cost of the scheme (including
fees) is within the Capital Programme, and does not exceed the
estimate by more than 10% or £25,000 (whichever is the less) the
Tender/Quotation may be accepted if the Head of Financial Services
is satisfied that the Head of Service can find compensatory savings
on other approved capital schemes which are within that Committee’s
programme and which will be underspent at completion.
(b) for a scheme funded from the Revenue
Budget, a Tender/Quotation can be accepted which exceeds the
estimate by up to 10% if the Head of Financial Services is
satisfied that the Head of Service can find equivalent savings
within the approved Revenue Budget for that Committee.
9.7.2 The provisions of 9.7.1 may, in the case of the Housing
Revenue Account Programme of works be waived by the Head of Housing
subject to the prior agreement of the Head of Financial
Services.
9.8 Evaluation of Tenders/Quotations
9.8.1 Tender documentation must explain how Tenders will be
evaluated.
9.8.2 The way Quotations will be evaluated needs to be recorded
by the Head of Service in advance unless price is to be the only
criterion.
9.9 Acceptance of Tenders/Quotations
9.9.1 No Tender or Quotation should be accepted by notifying the
proposed Contractor in advance of the Contract itself being issued
unless the Head of Legal and Democratic Services agrees.
9.9.2 If a Tender is to be accepted, the lowest Tender must be
accepted if the Council is paying for goods and services and the
highest Tender must be accepted if payment is to be received by the
Council unless:-
(a) the Executive (in relation to Executive
functions) or the Council or appropriate Committee (in relation to
Council functions) decides otherwise following a report from the
Head of Service concerned.
OR
(b) the Tenders or Quotations are evaluated
in accordance with Contract Procedure Rule 9.8.1 and the evaluation
suggests that accepting another Tender would be in accord with such
evaluation criteria.
9.9.3 A Tender or Quotation that needs changing or revising
(other than because of an arithmetical error or where Post-Tender
negotiations are permitted) shall only be accepted after consulting
the Head of Legal and Democratic Services.
9.9.4 No Tender or Quotation which would be part of a larger
Contract should be accepted unless it fully satisfies the
conditions of the principal Contract concerning sub-letting.
9.9.5 No Tender or Quotation shall be accepted unless the Head
of Service is satisfied that the Tenderer has adequate public
liability and other relevant insurance.
10.0 Contractual Arrangements
10.1 General Requirements
10.1.1 For the purposes of the Local Authorities (Executive
Arrangements) (Modification of Enactments and Further Provisions)
(England) Order 2001 every Contract with a value in excess of
£50,000 shall be in writing and be the subject of one of the
following:-
(a) a Contract prepared or settled by the
Head of Legal and Democratic Services.
(b) one of the national standard forms of
Contract previously agreed with the Head of Legal and Democratic
Services for that type of work.
(c) some other documentation approved by the
Head of Legal and Democratic Services.
(d) an Official Order (subject to Procedure
Rules 10.1.3 and 10.1.4 below).
10.1.2 All Official Orders must comply with the requirements of
Financial Procedure Rules. They must not incorporate or be
deemed to incorporate (by acknowledging a Contractor’s Official
Order or otherwise) any condition unless that condition has been
approved by the Head of Legal and Democratic Services.
10.1.3 If any proposed Contract for the supply of goods, plant,
equipment, machinery or vehicles requires or will necessitate
either the supplier or a third party providing maintenance or
support the Head of Legal and Democratic Services needs to approve
the terms for such maintenance and/or support.
10.1.4 Every Contract over £75,000 shall be under seal unless
the Head of Legal and Democratic Services agrees it is
inappropriate. A Contract of £75,000 or less can be under seal if
the Head of Service considers it should be.
10.1.5 It is a requirement of the Local Authorities (Executive
Arrangements) (Modification of Enactments and Further Provisions)
(England) Order 2001 that any contractrequired to be in writing by
virtue of these Procedure Rules must either be under seal or signed
by at least two Officers of the Council.
10.2 What the Contract must include
10.2.1 Every Contract must:-
(a) specify what goods, services or work are
to be supplied or performed.
(b) specify the price to be paid, the
estimated price or basis upon which the price is to be calculated
and say what discounts or other deductions have been agreed.
(c) specify the time or times within which
the Contract is to be performed.
(d) require that goods or services used or
supplied and workmanship carried out is in agreement with the
appropriate Standard. If there is an appropriate and current
Agreement, Standard Specification or Standard Code of Practice
issued by either the British Standards Institution or a recognised
body of any Member State of the EC, then that Agreement and/or
Standard should be specified with the addition of the wording “or
equivalent”.
(e) ensure that relevant Council policies
(including its whistle-blowing policy) are reflected in the
documentation.
(f) provide for liquidated damages to be
paid by the Contractor if any Contract for works or services worth
more than £75,000 is not carried out properly. This provision shall
not apply to the supply of goods, plant, equipment, machinery and
vehicles or if the Head of Service does not feel it is appropriate.
A Contract worth £75,000 or less may provide for liquidated damages
to be paid by the Contractor if the Head of Service considers it
appropriate.
(g) if possible, make provision for
continuous improvement in accordance with the principles of Best
Value.
10.2.2 Every Contract must include a clause which allows the
Council to cancel the Contract and recover from the Contractor any
subsequent loss if:-
(a) the Contractor (or any of his employees)
has offered or given any gift or other benefit to an Officer in an
attempt to influence the outcome of a Contract decision.
(b) the Contractor has shown (or not shown)
any favour or disfavour to any person in relation to the
Contract.
(c) the Contractor (or any of his employees)
commits an offence under the Prevention of Corruption Acts 1889 to
1916, or any subsequent amendments to these Acts.
(d) the Contractor (or any of his employees)
gives any fee or reward that is an offence under Section 117
Sub-Section (2) of the Local Government Act 1972.
10.2.3 The Head of Legal and Democratic Services may waive the
requirement of Contract Procedure Rule 10.2.2 if he feels that it
is not appropriate.
10.3 Variations during the Course of the
Contract
10.3.1 Every variation to a Contract shall be authorised in
writing by a person authorised to sign Official Orders (in the case
of goods or services procured by way of an Order) or by the Head of
Service in the case of other types of Contract.
10.3.2 If authorising any variation is likely to cause the
original Contract Sum (including any contingency sum) or total
project budget to be exceeded, the Head of Service shall not issue
such variation unless the Head of Financial Services has agreed.
The effect of this Standing Order shall not restrict the issue of a
variation if it would result in a stoppage of the Contract works or
a breach of the contractual conditions.
10.4 Nominated and/or Named Sub-Contractors or
Suppliers
10.4.1 No Sub-Contractor or supplier is to be nominated or named
unless the proposed Sub-Contractor or supplier has been vetted for
technical competence.
10.4.2 In the case of nominated Sub-Contractors:-
(a) these Contract Procedure Rules shall as
far as possible operate as if the Contract were between the Council
and the Sub-Contractor.
(b) the terms of the Tender or Quotation
must require the proposed Sub-Contractor to agree that (if
selected) he will enter into a Contract with the main Contractor on
terms similar to those in the main Contract as far as the work to
be undertaken or goods to be supplied is/are concerned.
(c) the Head of Service must tell the main
Contractor the identity of the Sub-Contractor whose Tender or
Quotation is, in his opinion, the most satisfactory. If that
nomination is accepted by the main Contractor, the Head of Service
shall accept the Tender or Quotation of the Sub-Contractor.
10.5 Custody and Retention of Contracts
10.5.1 The Head of Legal and Democratic Services is responsible
for safely looking after all Contracts under seal.
10.5.2 Heads of Service are responsible for the safe keeping and
custody of contracts not under seal.
11.0 Maintenance Of The Select List
11.1 The Head of Environmental Services is responsible for
compilation and review (at least every five years) of the Select
List following consultation with relevant Heads of Service.
11.2 The Select List may be amended as required by the Head of
Environmental Services who has discretion to:
(1) add a Contractor to or remove a
Contractor from the Select List and
(2) update the details of any Contractor on
the Select List.
12.0 Partnering
There is an increasing requirement for partnering contracts. In
so far as such is to be with the private sector these procedure
rules will apply but such arrangements may be considered a special
circumstance and the provisions of 1.5(b) may apply. Prior to the
commencement of any negotiations (as compared to establishing
whether such partnering may be of benefit to the Council) the Head
of Service shall fully discuss the potential issues with the Deputy
Chief Executive.
In the case of partnering arrangements with bodies designated as
public bodies for the purposes of the Local Authorities (Goods and
Services) Act 1970 these procedure rules in so far as they relate
to tendering requirements shall not apply but any proposal to enter
into negotiations shall be subject to the prior approval of the
Deputy Chief Executive. In all instances regard must be had to the
Financial Procedure Rules in relation to proposals to Externalise
Services/Competitive tendering.
Any partnering arrangement must be the subject of a written
agreement (in a form to be agreed by the Head of Legal and
Democratic Services) clearly setting out the partners respective
responsibilities and liabilities.
Table To Clarify Contract Procedure Rules
NB: There are different provisions for HRA programmed works
|
Value of Goods & Services
|
Advert |
Financial Vetting |
Select List
|
Notify Customer Services
|
Notify Audit
|
Cllr to Attend
|
Others to attend
|
|
Tenders Over £250k
|
Yes |
Yes |
No |
Yes |
Yes |
Yes |
Yes |
|
Tenders £150 - 250k
|
Yes |
Yes |
No |
Yes |
Yes |
No |
Yes |
|
Quotes £50-150k
|
No |
No |
No |
No |
No |
No |
Yes |
|
Quotes up to £50k
|
No |
No |
No |
No |
No |
No |
No |
|
Value of Works
|
Advert |
Financial Vetting |
Select List
|
Notify Customer Services
|
Notify Audit
|
Cllr to Attend
|
Others to attend
|
|
Tenders Over £250k
|
Yes |
Yes |
No |
Yes |
Yes |
Yes |
Yes |
|
Tenders £150 - 250k
|
No |
No |
Yes |
Yes |
Yes |
No |
Yes |
|
Tenders £50-150k
|
No |
No |
Yes |
Yes |
Yes |
No |
Yes |